Modeling is essential in the construction industry for planning projects, communicating ideas and ensuring work gets done correctly. Construction professionals have used two-dimensional (2D) site plans for these purposes for some time, but more recently, three-dimensional (3D) modeling has emerged as an updated approach. Which should you use for your next project?
Understanding 2D vs. 3D Modeling: Key Differences and Insights
2D and 3D modeling involve similar processes, and you can create both 2D and 3D models using computer-aided design (CAD), a set of software tools that assists designers in creating virtual models of structures, machines, components and other objects. However, 3D modeling takes things a step further by adding another dimension, as well as more information and capabilities. What is the difference between 2D drawings and 3D models?
Fundamentals of 2D Modeling in Construction
2D modeling involves creating blueprints, drawings and plans in two dimensions. These documents can describe the basic layout of a site, and where objects are placed, but they don’t include the dimension of depth. These 2D plans can be created on paper or in computer programs that are designed for creating models in two dimensions.
Exploring the Dimensions of 3D Modeling
The major difference between 2D and 3D modeling in CAD is that 3D modeling adds a third dimension. This means that 3D models contain more information than 2D models. They represent the finished site as it will look in real life. 2D models, on the other hand, provide valuable information, but viewers are left to imagine what the final product will look like. 3D models are created in advanced computer programs and incorporate data from Light Detection and Ranging (LIDAR) equipment, the Global Positioning System (GPS) and aerial photogrammetry. 3D models can contain a wide range of information types and can be used for grading, site layout and other purposes, in addition to the uses of 2D modeling.
Drive Your Project’s Success with Precise 3D Models
At TOPS, we cater to your unique needs with accurate earthwork estimates and critical 3D data. Whether your project is large or small, our models help ensure increased efficiency and accuracy for successful completion.
Opting for 2D in Site Modeling and Land Surveying: Scenarios and Benefits
While 2D modeling is an older technology, and many businesses have begun to replace it with 3D modeling, it is still valuable in certain situations. Some of the reasons a company might decide to use 2D modeling include the following:
Overviewing Landscapes with 2D Site Models
2D maps are useful for broad overviews of sites. They offer a simple, easy-to-read representation of what your site looks like from above. While they don’t include as much detailed information, 2D plans are useful for conducting high-level inspections and comparing large-scale changes over time. They’re usually high-resolution and zoomable, which allows you to inspect various parts of a project closely. If you want to give someone a simple overview of a site or project progress, you can quickly create a 2D map to meet those requirements.
Simplified Measurements with 2D Modeling
2D plans can also be useful when you just need simplified measurements. You might not necessarily need three dimensions for certain types of measurements, and creating a 2D map allows you to find them quickly and bypass the 3D measurements you don’t need. If you only need a cut and fill number for a certain location on a job site, for example, you can easily find this information with a 2D map. This capability is useful for making quick but accurate decisions in the field.
Compatibility Considerations for 2D Survey Equipment
Another reason that companies use 2D models instead of 3D models is that their equipment is not yet able to handle 3D files. As 3D modeling technology becomes more common, this problem is becoming less prominent, but it may still be a concern for certain firms. Some companies may not want to use 3D models at all for this reason, while others might use 3D models in the office but use 2D models in the field on handheld devices that may not work well with the 3D models. It’s important to note, though, that some handheld devices can handle 3D models, and many 3D modeling programs allow you to download models so you can use them anywhere, even if you’re offline. Many sites and computers do have the ability to display 3D modeling, but companies that are using older systems may not want to upgrade to avoid the upfront costs of new or upgraded equipment.
The Advantages of 3D Site Modeling and Land Surveying
3D site modeling offers capabilities that go well beyond those offered by 2D modeling, so it’s a smart choice in many situations. Some of the reasons you might choose to use 3D site modeling include:
Achieving Realistic Visualizations with 3D Models
3D models represent sites in a way that is true to how they will look in real life. While 2D models can explain the concept behind a plan, it requires some interpretation to determine how the project will look once completed, which can result in different parties having slightly different ideas about a project’s outcome.
3D models, however, show sites exactly as they really look, which ensures that everyone can easily understand the plan and helps keep all parties on the same page. With 3D models, every stakeholder, from engineers to owners to machine operators, can intuitively understand what the result of a project will look like.
You can even adjust 3D models to show what the site will look at different stages of the project or offer several variations on a plan, all in the form of a realistic, easy-to-understand visual.
Gaining In-depth Site Information Through 3D Modeling
While 2D models are useful for when you want a simple view of only specific types of measurements, 3D models are valuable because they can include a much wider array of project information. 3D modeling allows you to collect all of your information in one place so you can get a comprehensive overview of your project.
With 3D modeling, you can include basic site layout, grading, utility lines, landscaping and more all in one model. This capability allows you to see how different elements interact and see what a project will look like at various stages. You can also look at different layers of a model and explore it from different angles to get a more complete picture of a plan.
These features can help you to check that plans are accurate and feasible and ensure that you follow plans closely as you work. It’s also useful for costing and timeline estimating, as the increased volume and detail of information allows for more accurate estimating.
3D models can also help you to take more precise measurements because you can navigate around elements and view them from different angles. It’s easier to distinguish between various elements and ensure you measure them correctly in 3D than in 2D. Even 2D measurements, such as cross-sections, are easier to take when displayed in a 3D environment.
Implementing 3D Models for Advanced Machine Control
One of the most valuable uses of 3D models is machine control. Machine control involves the use of positioning sensors, such as GPS survey systems, sonic tracers, rotating lasers and total stations, to guide machines. These machine control systems use the information from 3D models to determine where exactly on a site a machine should be, the position a machine’s bucket or blade needs to be in and target grades. Sensors on the machinery communicate with the onboard computer, which is loaded with a 3D model of the project, to ensure the project is completed accurately.
In addition to increasing accuracy, the use of 3D model machine control enhances machine productivity and efficiency, reduces machine-related and raw material costs, eliminates the need for ongoing grade checking and increases worker efficiency. It automates significant portions of work and can take the place of traditional methods like the use of surveyor’s stakes.
Virtual Site Inspections and Walkthroughs via 3D Models
Creating a 3D model of a project also allows you to conduct virtual inspections and walkthroughs. Having a 3D model of a site available enables you to conduct thorough inspections of various aspects of your site from multiple angles without having to physically be at the site. You can also conduct virtual walkthroughs in a similar fashion to show others your site or update them on the progress of a project.
Facilitating Remote Communication with 3D Site Models
3D models make communication easier, as they enable you to include more information in one document and present it in an easy-to-understand format. Everyone can have access to the same information and see it in a way that makes the information clear so everyone is on the same page. This capability helps ensures that the results of a project meet everyone’s expectations. You can communicate with various parties using 3D models even if they’re all in different locations.
If not every party involved in a project is using 3D models, you may have to convert information back and forth between 2D and 3D. When a model is converted to 2D, it won’t contain as much data, meaning some information may become lost in the process. Converting the model makes communication more complex and susceptible to error.
Ensuring Precise and Accurate Measurements in 3D
3D models can help ensure accuracy in various ways. It can make communication clearer and easier. It collects all of the information in one place. When you use 3D models for machine control, it helps machine operators complete grading and other work more precisely.
3D modeling can also help to reveal issues with plans before work on a project begins. Because a 3D model creates a realistic interpretation of what a completed project will look like, it’s easier to spot clashes or inconsistencies. You can look at a 3D model from various angles and check that the design is accurate and realistic. Because you can see more information in one model, you can also see where elements clash, such as electrical lines that a plan shows running through rock in the ground. With a 3D model, it’s easier to spot and correct a variety of potential issues.
Deciding on the Best Modeling Approach for Your Project
So, how do you know whether a 2D or 3D model is right for your next project? You’ll need to consider certain aspects of the project, what technologies are available to you, what your partners are using and various other factors.
It’s important to keep in mind that, for many projects, using both 2D plans and 3D models may be useful. That way, you have both a simplified document and a more detailed model that you can reference as needed.
When deciding what type of model to use for a project, consider the following factors:
The complexity of your project: If your project is relatively simple, you may be able to just use 2D plans. Because 3D models can contain and communicate more information, the more complex your project, the more important it is to use a 3D model. While even simple projects could benefit from a 3D model, with more detailed projects, there is a greater need for 3D modeling.
The information you need: With 3D models, you can include more types of data. 2D models can only accommodate two dimensions, while 3D models can also account for depth. It’s also easier to include various other types of information in a 3D model, such as information about costs or utility lines. In general, the more information you have, the more useful 3D modeling will be to you.
How you plan to use the data: If you want to use your data for machine control, a comprehensive inspection or a virtual walkthrough, you’ll need to use 3D modeling. A 2D model cannot accommodate these more advanced uses.
The technology being used: Consider the technologies any partners on the project are using. If others are using 3D modeling, it may be beneficial for you to use it as well, as this will make communication and collaboration easier. Also, think about what technologies are readily available to you. For example, are your machines already wired to work with machine control based on 3D models?
Costs: Costs are always an important consideration for construction projects. 3D modeling may come with a higher upfront cost than 2D plans, especially if you need to invest in equipment before you can take full advantage of it. However, it’s important to consider the cost savings that using 3D modeling can provide over the long term due to increased efficiency and accuracy. Also, consider the costs of using outdated technology and the possibility that competing firms may be using more advanced technology.
Consult with an expert: It’s also helpful to consult with an expert in construction and modeling. They may be able to help you determine the right technologies to use for your project.
Partner with a Specialist for Advanced Data Modeling Solutions
At Take-Off Professionals, our team of licensed engineers, surveyors, and 3D data modeling experts create, on average, 1,000 machine control models each year. We have over 20 years of experience building 3D models for machine control, site work, and layout, as well as providing earthwork takeoffs. We provide detailed quotes and accurate turnaround times and can prepare your data any way you need it. Contact us today to discuss how we can help you win more bids and complete projects with increased efficiency and accuracy.
At one time the only way to lay something out on a jobsite was to locate a point in 3-dimensions. With the advent of having real time/location elevations from a surface model, points have become less frequent on the jobsite.
There are three major uses for points on a job: layout, surface creation, and collection. I will cover these and their use in surface-based production.
Point Layout
There is nothing more precise than staking out a 3D point. Accuracy settings can be adjusted depending on the type of work being done. This screen capture shows the distance to the point I want to stake. When the point is eventually located, I will also have a record of the distance from the point for future reference. This is all related to what a surveyor does, the carryover to surface based layout may seem extreme.
This accuracy is best used by surveyors and is a bit fussy for grading in general, so why would we use that detail? I always enforce the seperation of field layout and actual staking done by a surveyor. Our layout of a point is only a snapshot of the surface and surrounding influences of other 3D data. This myopic focus will tend to take away the big picture view that is necessary for site work. Sometimes you just need to nail a spot and point layout gets you there. Here are some instances where spot layout is beneficial.
Confirm a building corner for sidewalk offset.
Bases for hardscape items and playground equipment.
For curb layout we will often provide 3-foot top back of curb offsets for layout as well as pc’s pt’s and radius points for curves.
Street and road details. Staking station and offset is quick with points.
Lightpoles and electrical stub-outs are easy as points. Electricians will not have the technology to make sure you won’t need to dig up the asphalt due to misplaced electrical.
Fire hydrants, bends and tees. This gets into as-builts which we will cover later.
We do a lot of 3D point layout for storm and sanitary on projects. Flow line excavation and locating is much easier with points.
Parking lot striping has been laid out with points with good results.
The list can get longer as users become comfortable with equipment and perform basic tasks quickly. If you want to do more, we have a list of things to do with point layout that can keep users as busy as they want to be.
Points in Surface Preparation
It’s obvious that points are going to end up being used in building a surface. What I want to cover here is what happens when you use a point that was not obvious. We get so wrapped up in what we use for a surface, take all the engineering data and build. I have seen users try all sorts of fixes to lines and contours when a simple point would make it all better.
Corridors
Let’s first talk about points for layout and points to control a surface generated during data prep. The best use of point data on plans placed to control a surface is storm rims. The image shows a manhole that has an elevation called out in the plans. There is also a curb inlet with similar properties. The issue is these elements are in a street that is governed by a vertical profile and templates. If a point is added, it would not be necessary as the street will be correct here. We add points for two reasons: we can verify the elevation is correct, and that point will be labeled and sent to the field for layout.
Job Sites
If that example was a parking lot, the rules would be different. With no overriding cross slope information, we need these to bring water down to the drain. Here we see a grate against a curb in a parking stall. The elevation along the bottom of curb is going to get picked up and paving will drop to make water flow. What is not seen here is layout points. We will talk about those later.
Spirited discussions over beer include how to make the surface look around these inlets. The image above shows a single point at the center of box along the face of curb. Other users feel it important to run points all around the box in order to show that as a flat surface. Here is my take: a small box like this (2 feet x 2 feet) only needs one point. If it gets over that, use points to make it flat. The image below is the same inlet with elevations included to make the entire structure flat. Things did not get messed up with the additional vertices, but it can happen so be careful. Remember, each of these triangles are flat. The first image shows nice flat planes leading to the drain. The additional points made more triangles and they slope in an asymmetrical pattern distorting the otherwise nice flow to the drain. Further exploration brings up some interesting points.
With little change to the surface for a small inlet, there is no need to complicate things. This is flat here so the additional triangles and breakover angles are not huge. If the approach to the inlet was over 2%, it could have become messy.
Another area that benefits from points is controlled site grading. That is (usually grass) areas that need to drain or have structures like a playground. I will use points to make water move where it needs to as well as placing supports for installed items. Something to note here is that points for foundations, or bases, are not usually part of a surface model. The grading around these areas are often below the concrete and would only distort the surface. These would be added to a list of layout points to be laid out when it came time to dig footings.
General Rules
I use points to “connect dots” and improve conditions. When a point is added, you increase the number of flat triangles thus reducing the breakover angle between each triangle. This also makes each one smaller and smooths out transitions. With each addition of data, you run the risk of screwing things up, be careful. Here are some situations I look for when cleaning up a surface.
Contour Grading
In this first image, there is a valley that reduces in depth until it hits a rounded retention. There are steps in the valley and the addition of a break line will improve this. The break line is not the addition of points but a 3D (or 2D) line that is a visual connection of points. The line is only there for your convenience, the TIN connects 3D points.
I ran break lines along the top and toe of the drainage swale. This cleaned things up and now water will flow better. Any time you add points by the addition of a break line, make sure it does what you want it to do. I’ve seen a lot of additions that are not needed for a good model. Surfaces are best when the minimum number of extras are added.
The basis of this article is what we call “named points.” A named point is a point you will most likely list and stake to at some point during construction. They also get included in surfaces as well as used for locating. Cleaning up of the ditch, as shown in the image, brings up an idea. This could be easily laid out as a surface. In this case, there is a concrete liner that gets placed in the swale, and points help to get things right. When the surface looks good, we will add layout points so the form carpenters can easily set the forms for the pour.
Now that the water works the way I want, the addition of points will make a good transition to the field. The image is an example of what I would send, end points as well as a point along line for the bottom of the vee. This represents the outside of the concrete so that becomes the edge of the form. It is better to throw in a point or two to clarify the intent of the plans. Remember, you are in the office in a controlled environment. In the field it’s not as easy to look at plans, specifications and details in cold, wind and rain.
Point Collection
When a point is shot, you are doing it for a specific purpose. That eventual use dictates the collection method employed. GPS is an accurate tool but that changes with conditions and collection settings. A topo point will take a second. When you are shooting top of pipe for as-builts a longer occupation is better for improved accuracy. GPS increases vertical accuracy with a longer occupation of a point. The x, y coordinates will not shift much with increased time.
When you first initialize a site, the time you cook on control points can be as long as three minutes to get a good result. That time would be a waste if you did that for all your as-builts. Know when less can be as effective for the work at hand. I have seen field people not take enough time to get a point collected correctly. Don’t use topo collection for critical locations that are going to be covered up and accessed in the future. That information will eventually end up on a GIS database somewhere and others will use it for planning and excavation. We are making a long-term investment in getting a workable map of our work to make things easier in the future.
Point Organization
I can’t take the high road here. I start as-built collection with correct P Codes (Point Codes) and somewhere along the line I forget to change the code and my great field to finish idea is gone.
Establish a company standard for point naming. This should be done for layout as well as collection.
Try to set codes in the field as you collect. If you mess it up, don’t abandon the idea, just get it right again and fix in the office.
Collect more points than you need and more points of random areas. They will help tell the story when in the office.
Set up field to finish codes with company standard point naming. This is fluid and will change/improve over time.
Yes, points are part of a surface, but using them to locate and collection later is something you need to do and get good at. I will address field to finish solutions in the future. For the time being, get set up with a smooth transfer of point information to and from the field.
Many years ago, I proposed that machine control would change the surveyor’s role and made it a point to discuss this with many state surveying groups. As a rule, surveyors need to be exact. A circumstance could come up where one would have to defend their work in court. With the need for accuracy, surveyors were not happy with contractors bringing precision equipment onto a site. Some thought contractors were cutting costs by reducing survey crew trips to construction sites. However, the real reason was that a surveyor may have to go back and tell a contractor some of their work was done incorrectly. Every surveyor hates to return and re-pound stakes that got knocked over, so how do they make sure the contractor can perform great work independently?
Survey Builds Data
I have been involved in lively discussions to legal debates over the production of machine control data. Regardless of the state, the answer is always the same: data built by or on behalf of a contractor is not an issue. Once that got settled the question remained, “Who should build the surface you will grade to?”
Traditional Surveying
Survey is solely about points. Load calc points into a data collector and go out and place them on the ground. The contractor connects the dots and a surface is made from the points.
The image at the right shows what we were given in a set of plans. Points found on the plans are placed on the ground in three-dimensions with a stake. The cut/fill to the desired location was marked and the dirt was moved. When things got close, blue tops were placed with the top of the wood stake at finish. Other types have a staple in the top holding the whiskers, a good operator would “polish” the staple and get grade that
precise. The difficulty in this method of staking/grading is what happens between the hubs, a low spot or incorrect drainage is easy to miss. Only when a lot was paved would the problems show up. No matter how much spot checking we did, sometimes a spot would get missed.
Data Models
When I started doing this work, the only frame of reference I had was how things were staked and cut in the field. Because first generation equipment was difficult to use and problematic, training and ongoing support were normal. I spent more time in the field than in the office. We would build the model and I would be in the field for days, to weeks, training crews and getting a better idea of how to leverage the data that I collected.
The knowledge I gained by working in the field allowed me to create workflows that are now commonplace. The other problem we faced was that nobody knew how to build a model, but surveyors felt they were the best option. This is a learned ability and with practice anyone can become proficient, like me for instance. I worked long and hard to figure out how a model works in the office and the field. Coupled with a good understanding of how the mouse clicks transferred to the ground, I began to connect those dots. One of the most frequently asked questions I get is who the best candidate for a data builder is. I find it easier to train a computer savvy field person than try to get a CAD expert to think in three-dimensions.
In time, more people learned how to create good data and software ran ahead to improve commands and performance. The future holds the key to 3D design and implementation of data into the field. BIM has taken the lead due to multiple trades trying to occupy the same physical space. Currently much of that design work is done with CAD technicians producing the 3D models suitable for construction.
The ability to design, (or produce 3D data from CAD and plans) is mature. We will discuss the integration of surveying and data.
Cross Training
As more contractors started to create their own files, surveyors were not building as much data but keeping busy doing the important job of positioning. It’s necessary to understand what a surveyor does, but not actually do it. Surveyors need to understand data but not necessarily know how to build surfaces. Here is what each needs to know about the other.
Somebody must make a model for the machines to work. With model in hand, it’s time to go to the field. Surveyors are critical to any job large or small. I have seen the start of too many jobs by well-meaning contractors placed in the wrong spot or incorrect elevation. The nuances of positioning are complicated, and it is the surveyor who can assist in correct site placement. The GPS lead on the jobsite needs to have some of this ability too. The most important thing is sensing an issue and when to contact survey for work to be done. I have a surveyor friend who ten years ago would build the model and give the contractor a rover with the data loaded. They would start the job and call when they needed something.
I need to be clear; office and field civil construction workers are not doing survey. We are laying out and grading to information the surveyor knows is in the right place and will perform as intended. That is the end point of data and survey working together, so how do we get there?
Data Prep
I’ll run through the process when we work with a client on a typical site job.
We build the initial model and do the following:
Fix obvious errors and note them.
Make grading changes to reflect proper water flow.
Verify dates and changes to the plans to confirm current versions.
Report these changes to the contact(s). Usually this is the contractor. As the jobs get larger, we are often asked to communicate directly with the engineers and surveyors and include the contractor in the discussions.
Responses are received regarding questions.
Data is updated and work continues.
The data needs to start out as a representation of the finished product. There may be changes pending but not so detailed that we must redo a lot of dirt work. This rough grade file will keep the schedule moving and let the engineers know how long we have until we run out of things to do. Hard deadlines go both ways, stakeholders need to know we are faster at moving dirt and need answers to questions.
Your surveyor is invaluable at this stage, coordinate values need to be correct, the best way to know this is to bring them in early. As hired guns, we communicate with survey crews on jobs all the time. Be sure to do this early and with all jobs.
The next step in confirming data is to bring in control and verify locations and accuracy. Now that things are in the right spot and the data is close to correct, we can send the data to involved parties and gather input. Don’t expect a lot of information, everybody is busy, and most don’t have the time to review your data. It’s more of a courtesy.
Survey Functions
I have often been involved in some very detailed discussions about survey’s role on a job. I am an expert witness regarding disputes that sometimes involve surveying. I am no surveyor but have a good grasp on the practice. It takes time to be good at this and I leave it to the professionals.
The surveyor needs a plan for what they will do on your site. This prevents duplication of effort as well as ensuring it is going correctly. Here is a list of things to get right.
Understand what a site calibration (localization) is and what the report means. These numbers are critical and you need to understand them. When the surveyor is using different equipment than you are, you will need to perform this on your own. Compare the results to theirs to verify.
Know the difference in collection times. Sometimes you can walk and click, and other times you set up the bipod and cook for a minute. This affects accuracy and a few more seconds on various point types will be rewarded.
Respect procedure. Don’t take phone calls or talk to people on site when you are involved in critical tasks. When the surveyor tells you not to bother them now, it’s not because they are a jerk. They are in the zone and don’t want to miss something. When you are laying out curb points for example, always do things the same way. For example; I always do PC, RP, PT. Pick your method and stick with it. Here is a simple curb layout. This is what I want to see when I’m laying out.
Perform daily check-ins. Know that when you start your day you are as correct as you were yesterday. Do this for rovers and machines.
Share and listen. The information needs to go to the surveyors and engineers for review and comment. Again, you will not hear much, it’s just good to let them know what things look like in the field. This is a big advantage on remote jobs.
To wrap things up, learn enough about the other person’s job for better communication and efficiency. None of us can do a job that we are not trained for, but an understanding of the roles around you will go a long way in making things run smoother.
The request for “a quick takeoff” means different things to different clients. When a client makes this request, I generally know exactly what they need. The quick dirt number I provide usually leads them to knowing how much Teflon tape they’ll need for the water pipe joints.
The procedural filters we use while doing a scope of work will change over time, coinciding with the different stages, to make our job easier and more productive. Clients each have different requirements for their takeoff, eventual bidding, and final production. To walk you through this process, I will begin with the basics and investigate advanced ideas while I progress.
During this offering, I will speak in the first person, like it is “our job,” acting as a consultant who will perform the takeoff and processing services for our clients and not perform the work ourselves.
Just a Takeoff
When we “old timers” used to receive a request for a takeoff, the rules were simple and worked well for years. With more technology introduced, the deliverables clients expect to receive are much more advanced. Acquiring additional information, in respect to a civil site takeoff, may help you get your numbers right. The data in hand is purely for bidding purposes, but clients often want more information than they need. It only wastes their money.
Takeoff to Project Management
Once a client has won a job, I am all for details and more information. Many of you know my old line, “if you’re using your takeoff for data, you are doing too good a takeoff.” The same holds true for takeoff detail. If your takeoff can instantly become a project management document, you’re wasting your time with a too detailed takeoff.
The difficulty comes from transitioning a file from takeoff to production. Many think that you need to start over in order to make things work for production. As an old timer, I would agree with this, but industry software has made this a non-issue. Here are some of the transitions we need to make when the job is won.
The Dirt Number
As an experienced estimator and large-scale project manager, I always keep some money safely tucked away in different scopes for the eventual rainy day. The dirt number was one way to do this. During the bid phase we might have listed the strata from bore logs, but often they are not available, or time won’t allow it. Now that the job is ours, I start the deep dive into the actual cost of dirt moving and investigate the following items:
I get our drone, or hire a local drone operator, to fly a pre-start topo. We all know once you mobilize to a site and put a tooth in the ground, all bets are off for another trip to the well for more money because the OG information supplied in the plans was incorrect. When we get the topo information, the takeoff is rerun. If we are better than before, I use the advantage in my rainy-day fund. If the numbers go bad, we call a meeting with the owner and renegotiate. Make sure this is all done before digging. When fast-tracking, you still have the date the topo was flown as well as images that show no disturbance. An email to let everyone know this is an issue will serve to keep the issue open until a change order is processed.
The different amounts of each type of dirt that needs to be moved is the next area I look at. If you had the bore logs and they were entered into the takeoff numbers, review them and start to look at actual costs for handling each material type. Many contractors know their areas well and will assign an average dirt number to the quantities at bid time and come back later for refining. You can now figure amounts much more closely with additional information.
For mass haul analysis, cut/fill and enter our average number for dirt moving works well for bidding. These quick numbers are a result of careful figuring based on prior work and should get you in the ballpark to win some of the hard-bid jobs you go after.
When you get the job, it’s time to start drilling down into the numbers and squeeze those few percentage points to make the boss some money. The amount of dirt getting moved at what distance on what quality surface is the breakdown. I will review a site mass haul in the video and go over what I look for in the reporting.
Many site jobs require going offsite to dispose or import material. This is another chance to make some calls, shorten distances and lower costs. During the bid, you might have used local numbers or made a quick call to plug in a price. Now is the time to get some savings from the averages used in the proposal.
Now that we have won the job and returned from the celebration, it’s time to be good to the owners, and help us a bit along the way. We all need to bid to the plans and specifications and consider the pricing on additions and alternates. There are too many variables to go over here, but each contractor knows that there are a lot of better ways to do certain parts of a job than what’s been drawn by the engineers. We see the biggest disparities in chain business when plans have been drawn out of state without intimate knowledge of the area. Others have some luck by having worked in the immediate area and are then able to recommend some changes that will enhance the job and save everyone some money.
To this point, I have used quick and basic takeoffs that drove the dirt numbers without having to redo anything. I just spent more time drilling down in the listed areas. I made a lot of owner’s good money by being diligent in the above areas except when back in my day we walked the topo, drones weren’t invented then.
You need to perform the above first. This ensures the original ground information is good, you understand conditions, as well as knowing how far you’ll need to go for material import or export. With this completed, it’s on to the next phase.
Project Management Process
A lot of time is wasted moving materials on a jobsite. It could be dirt that was set incorrectly. To pipe and other import items that always seem to be in the way. We now need to elevate the quality of our data from a takeoff to a performing site data model. The big question is whether to start over or improve the takeoff to data quality. Here is my process:
The Big Stuff
My first question is, did the overall footprint change? With the basic layout still intact, the improvement of the takeoff is my first choice for a data model. We already have the layers broken out and most of the COGO (Coordinate Geometry) is good.
Many times, there are changes to the plans after we have won the bid. Hopefully some of them are from our value engineering proposals to the owners and engineers. With that information in hand, a fresh look at the model will tell you if you should start over or improve things that were in the takeoff. With good layer naming and consolidation, it is not hard to add islands or redo a changed curb line. Resized retentions and other common areas are easy to remove and replace. I will go over a few of these points in a video regarding the use of layers and how to use them to your benefit.
The Details
When we do a takeoff, little attention is paid to making a parking lot look great. We elevate curb lines and possibly change bad spikes. I have done countless studies and presentations from a takeoff to data model quantities and the difference is miniscule. The price of a data model is about 3-times what a takeoff costs. It is not worth our client’s money to get crazy detailed with a takeoff. During the bidding phase, plans are often not approved by all agencies and will change before being issued with final approval. It is important to note the delta changes on the latest and greatest set. A word of advice; never trust clouds on the plans to indicate all the changes made to the job. I like Bluebeam sheet compare for this, I will do a video to explain.
With a final set of approved for construction plans in hand, we can get to work. Let’s elevate the takeoff data and prepare it for construction.
Drill down into the dirt as explained above. Get those numbers correct and detailed.
Break out the job the way you need for phasing and ordering. You have gross numbers, now you can meet with project managers and superintendents to organize things better.
Verify the data model is good, (at least for now) with current changes. During data building, we will find issues and submit questions. In the mean time, you can leave the data as-is for the rough grade phase. If the questions would affect the initial mass earthwork calculations, leave the area blank in the model until you get guidance. Don’t move dirt twice to look busy.
Add numbers to the quantities. All current takeoff software can export to your spreadsheet estimating program or Excel for adding prices.
Go back to the takeoff and add any additional information you want to run through the process of measure, export, and price. We will do everything from count light poles, measure striping, breakout straight and curved curb, and place playground equipment bases. With the plans in front of you digitally, we find it good to even measure items that will be subbed out. It sure is nice to adjust a supplier’s estimate and save some money.
The U.S. Interstate Highway system is almost complete. Regional networks are mature, and the new right of way is geared for housing. Luckily, we still see new alignments and the percentage is increasing for repaving and full reconstruction. This increase has led us to become efficient with sometimes difficult road improvement jobs. Let me explain.
Types of Rehab
There are three basic types of road rehabilitation all requiring a different approach to the data. While I have defined the types for data purposes, there are projects that can be a combination requiring a change in the process.
Full Rehab
This is the easiest and currently the most popular type we perform. The road may move horizontally and/or vertically and none of the previous roadway elements are to remain. Paving, curbs, and driveways are all replaced. Ditches will usually be reworked, if there is an underground storm system, it may change as well.
With everything being new, it may not make sense to refer to this as rehab. The reason is at some point the work you are doing will need to connect to something that will not be moving. Driveways, buildings and off-right-of-way drainage are required to match-in with the least amount of disturbance possible.
Mill and Fill
Asphalt paving does not have a great life in many parts of the country. Freeze-thaw in the North, water and heat in the South, and brutal sun in the West define the finite life and eventual repair of the wear surface. When spot repair is no longer possible, the road surface will be milled, and a new full-depth mat will be laid on the freshly compacted base.
We will go into detail later, but the curbs are usually in good enough shape to keep. We are now required to respect the vertical and horizontal constraints of the existing road. In addition, there are required minimum and maximum coverage and lifts for the base and wear surface. This gets difficult to work with, as there are many constraints plus having little or no ability to try and fit everything in.
Widening
Right of way acquisition is usually done with the future in mind, especially with larger arterial roads. As traffic counts increase, lanes are added to accept the load. When confronted with a widening job, we are concerned with two major points. First, the condition of the edge we are joining to, and then the topography of the extension. I will detail these in a moment.
The Basics
When doing rehab work, we usually go the route of a road job. Alignments and templates are a good start to get things right and, most importantly, a way to easily adjust as things change. The single biggest issue with rehab projects is the dynamic nature of all the parts that need to come together. Here is an outline of what we like to see.
Horizontal Alignments
Ordinary COGO (Coordinate Geometry) will be provided when doing a new road. Sometimes in a rehab job, the plans call out for following the existing road center. Yes, this is a loaded statement from the designers. There may be a line on the plans that might be an old alignment, or something drawn for convenience. Alignments with good instructions are easy to get on your screen, but what about that mystery scratch in the near middle of the road? There are several alternatives.
If you can’t get a good centerline from the CAD, you need to decide on how to guide machines for the work. A best fit centerline takes the edges of pavement and averages the distance between them to give you something to steer to. Here is a set of shots that were taken along the existing edge of pavement along the slip formed curb/gutter.
There are many ways to get an alignment, in this case I am using Carlson’s Best-Fit Centerline. You can use points or lines. Here I drew lines through the points with arcs in order to give the program a smoother start to figuring out a centerline. The alignment is drawn through the upper line (shown above) and will offset to get it to the approximate center.
I often times will do this on the other side of the road as well. When this is necessary, you need to either make a new averaged centerline or create two different roads using one for each side. These cases are generally for older, small streets and roads where environmental conditions have caused heaving and erosion to move the curb. Logic says we will replace those sections so this is a rare exception, not the
rule. Knowing that, you are now able to fix real issues.
The new centerline is shown here. It deviates from the edge by almost 3-feet in the worst spot. This is too much. Changing the parameters will tighten things up. This is shown in the video.
With a good alignment to steer to, we will now work on the vertical.
Vertical Alignments
With horizontal alignments we are trying to get a centerline close to actual. With a vertical alignment, the stakes are higher. When the vertical profile corresponds with the centerline, it must follow road speed rules regarding cross-slope and the finished job needs to look good.
The job depicted above has 3D shots along the edge of pavement, as well as, centerline shots that are turned off. With these 3-points acting as cross-sections, we can create a good existing road surface as cross-sections. Don’t be alarmed if a contoured surface looks bad, a cross-section look is the best way to generate a finished product.
I have used Carlson’s Road Rehabilitation Profile command with good results. You will need to get things in order, including some of the outlined steps I will reference. When the pieces are in place, you will have access to the options shown in the dialog box. Lots of power is provided to automate a sometimes-difficult task.
With the alignments done be assured you will be revisiting these to make things work better. We will generate cross-sections to verify the quality of the data.
The following is the Carlson section alignment dialog box. There are enough options to give you the results you are looking for. I am using these options for the job in this
article.
With the section interval and special stations defined, I will now create sections of the existing road to give me an idea of what I’m looking at.
Gathering Existing Data
I need to mention a critical point. When we work with clients who build models, we insist the shots are taken with a total station. GPS accuracy is not reliable for the number of required shots and would take too long to get low residuals. A robot and one person can shoot quickly and with accuracy to make sure we are not wasting time. We accept GPS shots only to fully rebuild the job after receiving good data.
Section Review
The production of cross-sections will be the true test of what needs to be done next. I have spent a lot of hours getting things ready for production on rehab jobs. The constraints of the existing features that remain and the rules imposed by the parameters of the road design make the task difficult. It may be necessary to rebuild the job several times in order to make everything work.
Also be aware of the hierarchy of importance in case something must give. For example, we need to keep the curb but need to go less than the required 2% slope. That’s an easy one, but there may be situations where several rules need to be flexed for things to work.
Here is one such example. The road is straight and calls for a 1.5% cross-slope. The right side of the road is almost flat. We need to review up and down station to see how far this extends. The solution here was a 75-foot curb replacement due to heaving of the existing curb and gutter.
With requirements that are often out of the requested values, this type of work takes more time. Many rehab jobs just want to follow the existing road, mill the existing surface and come back with minimum cover. This type of job still needs data to work correctly.
Carlson has a tool I have used with great success. The Match Reference
Section Slope command allows you to specify the desired slopes and the limits of deviation to it. Here we are trying to get a 2% cross-slope with a variance to try and make things fit better.
After filling out the dialog box, the command has listed the varying cross-slopes generated by the settings.
Adjusting the Parameters
There are two tools I use to verify a rehab design. The first is the actual material to be used. At some point there was a takeoff done, and I want to make sure we are in the ballpark.
This is just a portion of the report, but the totals are in line. To adjust things, go back to the Process Options dialogue box and check the Adjust Template Grade Table. The side not associated with the Profile Grade will adjust. This may push the slopes outside the design parameters and require a variance to get the volumes down.
I will then plot the sections to verify the profile is doing what I want it to. With a small road like this there is not a lot of room to move, but if the job is several miles long small tweaks can bring big savings. This particular road is getting 8-inches of white paving. The red is the sub-base needed to bring this up to grade. Had this trend continued for several stations in both directions, I would revisit the vertical profile to try and pick up some material savings.
Summary
The task may sound daunting, but the job needs to be broken down into the individual parts that make up the job. I have tried what seemed to be quicker and easier methods, but changes are near impossible and always take longer.
Approach each part of the process as a separate task and the delineation makes things easier to imagine. With more of these jobs coming along every day, it pays to be proficient.
I have featured Carlson because I have experience using the commands for road rehab projects. Other software can accomplish the same tasks. The commands will be different, but the procedure remains the same.
More contractors are taking advantage of stringless curb technology today. At TOPS, we got involved with stringless curb when it was proposed as an alternate application for machine control. In their quest for increased productivity, some of our clients are early adopters which we credit with our first-hand experience in using the technology.
The Concept
The idea is straightforward. Adapt the use of alignments for paving systems to a curb machine and eliminate the string. There isn’t more to do for the transfer of the guidance and the technique seems easy to perform. Unfortunately, we encountered some problems along the way. But lucky for you, we have taken the time to point them out and guide you on this process.
Stumbling Blocks
You need to build an alignment-based project that has the usual elements, horizontal and vertical alignments, and a template. Brands vary but the template can be used to pick the side of the alignment the curb is on, as well as, slope for fill or spill curb.
One of the difficult things to do is to make the alignments as if you’re in the field doing the work. This varies for our clients and it is something you need to coordinate with the curb crew.
In the example here, I bring up two interesting points:
This job is the addition of more parking to an existing lot. When joining to that curb, we need to get accurate shots in order to smoothly pick up the slope of the current to future curb.
The 90-degree corner will necessitate a stop in the alignment. The question for the field is where to start one alignment and stop another.
Alignments
As with any road job, a horizontal and vertical alignment are required. With curb, things need to be different. There will be some figuring with both.
Horizontal
Each curb is a separate road job. As shown earlier, you need to coordinate with the field as to the start and stop points. Experience has led us to have this consistent, but it takes time to coordinate. When you
get it figured out, it will stay standard for the most part.
When working with a closed island with all curves, the line needs to either stop short of the end or go past it and not be on the same path. This example shows the alignment stopping .10 feet from the start. This gives the machine a chance to complete the run without the software problems of an alignment running back on itself.
We will also have the alignment bypass the start by a couple hundredths of a foot when it gets back to the start point to keep the lines from intersecting.
While building the alignments you are also providing a full takeoff of the curb so the field can schedule concrete and plan the pour accurately.
Vertical
This is where things get interesting. We all know that good plans have elevation callouts for the major points of a curb. This example is trying to do that, but this job has sheet graded contours that make things more difficult. We need to pay attention to closed areas that may trap water and make them back-flow into the main slope plane.
Breakover Angles
This is by far the most critical part of designing stringless curb files.
Here are the elevation points as called out in the plans. The curb moves along but there are angle breaks with a 2% delta. When entered into the machine like this they will cause it to abruptly change slope and make a mess. To remedy this, two things must happen.
Vertical curves must be added to the alignment to smooth out the transition in slopes. Our method for figuring the amount of curvature has been derived through experience working with machine control and curb machine vendors. Experience will need to be your teacher here.
After making the curb look right, the new edge of pavement 3D information needs to be incorporated into the model so the subgrade and paving are not affected.
Here is the alignment after the addition of the vertical curves. The transition is now smooth, and the machine will make the slope change gradually so things look right and perform well.
In the images, the difference may seem subtle. In the field, it is scary to see the machine try to do an instant 3- or 4-degree slope change. I’m sure the question will come up in a cart and horse fashion. If you are changing the parking lot surface, should you design the curb first? Most jobs don’t use stringless curb. The ones that do are usually requested after the surface file has been made and the curb contractor wants to use the technology.
The initial file creation is procedural and a process should be followed. This is because there may be 50 alignments for a big site job, and you don’t want to go back and check every line to see if you missed something. There isn’t much rework involved after the curb alignments are returned to the surface, we just want to make sure base depths conform to plan. The following is an outline of the entire process.
Create Curb Template Alignments
Save the file as a new version to keep the surface file alone
Create breaks for machine control
Create a vertical and horizontal alignment from the curb lines
Station the horizontal
Add vertical curves to smooth out the profiles
Create the proper exportable road file. Brands and requirements vary
Create New Surface
Do another save with a new name
Remove the use of the initial curb elevations in the model
Set the vertical profiles as the new curb lines
Offset the lines in three-dimensions to get the lines locations and elevations to gutter or edge of pavement
Adjust the surface in areas that make it smooth and well drained
A bit easier said than done, but experience has really helped us get this operation efficient. The curb files we make for clients can guide stringless curb with confidence. I remember years ago when the head of Gomaco asked me why I thought anyone would use stringless and how I planned on giving the crews confidence to spend tons of money and time with no string to lead the way. Here is what I stated and how a company gains trust.
The curb (or white paving) is derived from the model used to blade the surface. If that looks good, things are okay.
Use a 4-wheeler to do a dry run. Load the road job and drive along the curb, you will see any problems before the pour.
With all these advantages to stringless mentioned, file preparation is not a big chore. I have some sad stories about stringline that caused us problems over the years. A few dry runs of practice and maybe some “air-paving” will get you comfortable and ready to make the move to automating curbing and paving.
With 3D technology, earthwork modelers and surveyors can view virtual models of proposed projects before the groundbreaking work commences. Different types of software can generate such visualizations, and this has led to the BIM vs. CAD modeling debate. Both options have their benefits and supporters.
For anyone new to these software tools, it’s important to be able to make an informed BIM and CAD comparison. Therefore, it is crucial to understand the pros and cons of BIM and, likewise, the pros and cons of CAD.
Make a Precision Decision with TOPS 3D Modelling
Get ahead in your construction initiative with TOPS. We employ a team of experts to develop 3D machine control models, ensuring a clearer, more precise vision for your project before construction commences. Using TOPS provides easy work order creation and thorough project visualization.
Building information modeling (BIM) is a set of software tools that make it possible to visualize a design idea with realistic dimensions from a multitude of angles. With BIM, design teams and work crews can have a virtual experience of a building, road, bridge or monument before the structure is physically constructed. For all the parties involved in the conceptualization and construction of a structure — including earthworks and surveying crews — BIM provides the following benefits and features:
Preventing Conflicts with BIM
BIM tools allow earthwork teams to determine whether any clashes might occur between a proposed design and the underlying conditions of the site in question. For example, if a building would need deep plumbing yet the ground being excavated sits over thick roots and rocks, these discoveries can be factored into the design plans to avoid issues down the line.
Reducing Errors Through BIM
BIM technology makes it possible to catch any errors that initially appeared in a proposed design before the construction work goes into effect. For example, if earthwork crews discover that the dimensions of a proposed building design will not be feasible at the prospective site, planning crews can take this information into account and either make adjustments or change the overall plan.
BIM in Construction: An Overview
BIM software is used by construction crews who break grounds on new lands to establish the foundations of roads, highways, buildings, bridges, monuments and structures. The software makes it possible to determine which structures will ultimately work over certain types of soil, thus making the processes involved with earthworks easier for planners and crews.
BIM for Ground Logistics Enhancement
BIM software contains a range of features that specifically outline the logistics of plumbing at a given work site. This way, planners can determine whether the stretch of land in question will be suited for the project at hand, be it a tall office building or a wide industrial facility.
Planning Piping with BIM
BIM solutions make it possible for earthworks crews to determine which type of piping will suit the stretch of land in question. The software can be used to create 3D piping designs that take into account the diameters and lengths necessary to transfer water underneath a proposed building site to the nearest reservoir.
Enhancing Collaboration with BIM Tools
BIM solutions offer collaborative tools that make it possible for earthworks teams to interact with other teams in the construction process, from designers and architects to builders, planners and investors. Collaboration tools include communication technology that works across different platforms, allowing cloud-based branches to interact with more traditional departments.
BIM and Visualization Technology
BIM tools make it possible to visualize a site in 3D and determine how a potential structure will appear from the ground up at a given site. Based on the position of the proposed structure, the tools allow earthworks and construction crews to determine how sunlight will hit the walls of the building or factory and potentially light its interiors.
Sequencing Steps with BIM
BIM software programs arrange the building process in a series of steps from the ground up, including the logistics involved for earthworks crews. The tools can be used to determine how wide the clearance will need to measure for a proposed structure and how deep the ground will need to be broken to support the height and plumbing needs of the building in question.
Exploring Advanced Features of BIM
BIM solutions go beyond 3D technology to make a full-scale planning sequence for earthworks and developers. In new and upcoming versions of the software, BIM is activating tools in 4D, 5D and 6D, giving users the ability to visualize cost logistics in tandem with design concerns. These more advanced features also make it possible for users to determine the thermal and acoustic properties of a proposed building on the site in question.
Addressing Potential Issues With BIM Software
On the downside, BIM has yet to be developed to the point of universal compatibility across all branches of the construction industry. Companies and crews that have fully embraced the technology may have problems communicating certain ideas, information and visuals with cooperating entities that still rely on older technology.
Due to the relative novel nature of BIM technology, expertise in BIM software is a relatively small field. Consequently, there are few technicians to consult when users need outside support on a given issue.
Exploring CAD (Computer-Aided Design)
Computer-aided design (CAD) is a set of software tools that allow designers to create 2D and 3D virtual models of buildings, structures, machines and parts. For surveyors and earthworks crews, CAD makes it possible to review a proposed structure before commencing work on the ground. The features as well as pros and cons of CAD can be summarized as follows:
Visualization Benefits of CAD
CAD software makes it possible for designers and project developers to visualize a product or part in advance of its production. The software can be used to examine a proposed design from a variety of angles, both inside and out. Whereas conventional designs offer a flat illustration of a proposed idea, CAD makes it possible to step inside of a design and view it from a 360-degree perspective.
CAD’s Role in Improving Communication
CAD allows developers to communicate about the logistics and dimensions of a given design and make improvements as discoveries come to light. For earthworks crews in need of new tools and machines for an upcoming set of tasks, CAD provides an easy way for designers to communicate with team supervisors.
The Application of CAD in Structural Engineering
CAD software accommodates the various aspects of structural engineering. Moreover, most CAD programs offer functionalities that apply to specific industries and the various branches that the projects entail. For projects that involve railroad, tunnel or freeway construction, the design features take all the dimensions into account as the design team drafts a 3D visual of the proposed structure, which earthworks teams can then examine and use to visualize the intended finished project.
CAD for Earthworks Logistics
When the design for a proposed building, road or bridge is created on a CAD platform, the visualizations that the technology provides make it easier for earthworks crews to foresee how the finished structure will look from the ground up. This knowledge can then be compared to the findings of work teams as they survey the land in question and prepare to break ground.
Ensuring Accurate Design with CAD
CAD platforms make it possible for civil engineers to generate maps and analyze specs across a stretch of land. This research enables better-informed designs for railways and tunnels, thus reducing potential errors and costly redrafts down the line. This information can then be communicated to earthworks crews, making the overall plan more efficient and easier to bring to fruition.
Facilitating Input and Feedback
CAD platforms allow conceptualists to take a raw idea and turn it into a three-dimensional design. This allows different branches of a development team to mutually review a proposed design idea and make suggestions that can easily be implemented. If an earthworks supervisor spots an issue with a proposed design, the design engineer can immediately take this feedback into account.
The Advantages of Advanced CAD Tools
CAD software comes equipped with various design tools that facilitate ease of use and also make it possible to achieve visualization effects that would not be possible with a flat illustration. For example, both 2D and 3D CAD software contains a gripping feature that allows designers to pull, alter, adjust and reshape the dimensions of a proposed structural concept. If an earthworks supervisor reports that a road or pavement design requires a width adjustment, a grip tool can help employees quickly make those changes.
Potential Challenges When Using CAD Software
CAD software typically takes time to master, meaning that the cost of training can be high and the learning curve can be long. Moreover, the number of CAD experts is relatively small, which can make it difficult to find help if a problem arises.
For any company that has yet to migrate to a cloud server, CAD would be a step removed from that company’s technical infrastructure. As with most new technology, CAD is primarily designed for companies that are up to date on today’s more advanced systems.
BIM vs. CAD: Highlighting the Differences
A quick rundown of the features of BIM and CAD makes the two seem rather similar. So how do you compare BIM and CAD? The two have some crucial differences that make each more suitable for different types of projects. So what is the difference between BIM and CAD?
The biggest difference between BIM and CAD is the interactivity of the different dimensions during the editing process. BIM has interconnected objects, so any change that needs to be made in a building design, such as the width of a wall or corridor, can be done in a single edit. CAD does not have interconnected objects, so edits must be made individually.
CAD was developed to design virtual models for everything from appliances and furnishings to automobiles and rolling stock. CAD software tools are used to create 3D visualizations of the surrounding bodies of vehicles and tools, as well as the smaller parts that comprise the motors and fans inside each machine.
CAD can be thought of as a computerized sketchbook in which designs are hashed out and ultimately refined in 2D and 3D renderings. Each line works independently of one another and can be adjusted or eliminated without affecting any of the surrounding or underlying lines in the design. Therefore, if the design for a parking lot or road requires an extra three feet on one side, you can adjust the line that represents that side to accommodate the change in dimensions.
Complex CAD designs consist of numerous sheets, each with separate lines that are overlaid in a virtual file. If a design needs to be adjusted, you must adjust all the layers affected by this change individually. If a design consists of many layers that must each be adjusted in tandem with the others, making revisions can be complicated. With CAD, there is no way to synchronize the layers into a single-action item for a multi-layer adjustment.
BIM was developed more exclusively for the virtual design and multi-dimensional visualization of proposed building ideas. As such, the tools are designed to digitally render the complex dimensions of all the parts that comprise the interior and exterior of a residence, factory or office building, including the walls, stairs, doors, windows, ceilings, plumbing, wiring, lighting and ventilation.
A major difference between BIM and CAD is the interactivity of the different dimensions during the editing process. In BIM, the dimensions that comprise an object are interconnected. Therefore, any adjustment that needs to be made in a building design, such as the width of a wall or corridor, can be done in a single edit.
In BIM, the dimensions of a given detail can be synchronized to all instances of the detail in question. For example, if the windows on a building are initially designed to be 3.5’x5’ and need to be adjusted to 4’x5’, you can change all the windows on the virtual building with a single adjustment.
Deciding Between BIM and CAD: What’s Right for You?
Earthwork modeling and surveying teams can use BIM software to determine the ground dimensions of a proposed structure. Surveying crews can take a proposed building design and determine whether the chosen piece of land is right for the project in question. Earthworks modelers can then use the software to design the depths and dimensions at which ground will need to be excavated to set the foundations and build the sub-levels or layers of the building, factory, road, parking lot or structure.
For earthwork modeling, BIM tools can facilitate a more efficient flow of tasks because the software is designed to edit complex dimensions in a few steps. When all the dimensions of a construction layout are taken into account, BIM offers a more complex set of dimensions from various angles in a virtual preview. This way, all the parties involved in the construction can review the measurements beforehand and make suggestions or edits in advance of the project’s starting date.
BIM software tools can be especially advantageous for earthwork modeling of designs that consist of multiple levels. For example, if a development team proposes a multi-level courtyard across an acre of land, BIM tools can be used to accurately render the dimensions of this idea. The surveying team can then review this virtual design and provide suggestions and feedback. Construction crews can then reference this final design when it comes time to break the ground for the courtyard.
Data Preparation and 3D Modeling by Take-Off Professionals
For complex site work, it’s crucial to have 3D models to preview before construction begins. Take-Off Professionals is staffed by a team of expert engineers who develop 3D machine control models for earthworks projects as well as perform construction material takeoffs. Regardless of the size and complexity of the project in question, we can prepare data the way you need it. Contact Take-off Professionals to learn more about our 3D modeling services.